Development Workflow
Jump to navigation
Jump to search
Development Workflow | ||||
---|---|---|---|---|
Regular Ticket | ||||
Steps | Role & Status | Assignee | Description | |
1. Creating | Author | |||
→ | New | IT Development | Writing a Task and Description in Redmine for IT Development | |
2. Analyzing | Project Manager (PM) | |||
↑ | Analyzing | Author | ||
→ | Analyzing | PM (if on analyzing) | Analyzing of the task and writing Terms of Reference and Test Planning (if needed) | |
→ | Paused | PM (if on pause) | During the analyzing, a decision was made that this ticket is not relevant at the moment or this ticket can't be developed at the moment | |
→ | Queue | PM (if in line) | ||
x | Rejected | If the ticket was created as a duplicate or during the analyzing it was decided to reject this ticket | ||
↓ | Development | Developer name | Preparing the application and developer priority (Give the application Development Priority A, B, C, or D). A maximum of 3 category A tickets can be assigned to a developer at the same time | |
3. Development | Developer | |||
↑ | PM Analyzing | PM | ||
→ | In progress | Developer name (if on development) | ||
→ | Development is suspended | Developer name (if on pause or in line) | If the developer received an urgent ticket or a Hotfix, then the ticket should be moved to this status | |
↓ | Code review | Senior-Developer name | Write a link to the merge-request in the ticket | |
Senior Developer | ||||
↑ | Rework | Developer name | Write a comment in the ticket | |
→ | In reviewing | if need time | ||
↓ | Move to Dev | Developer name | Aprove to Dev | |
Developer | ||||
↓ | Test Dev | QA | Merge to Dev | |
4. Testing on Dev | Quality Assurance (QA) | |||
↑ | Rework | Developer name | ||
→ | In testing | Tester name (if on testing) | When a ticket is on testing, the QA assigns this ticket to himself. Write the test result in a comment. | |
→ | Testing queue | QA (if in line) | ||
↓ | Test Dev (if needed) | Author (if needed) | If necessary, assignee the ticket to the Author for feedback | |
↓ | Testing has been completed | QA | ||
Author (if needed) | ||||
↑ | Rework | QA | ||
↓ | Testing has been completed | QA | If everything is ok and the conditions of the ticket are done. Aprove to Stage | |
Quality Assurance (QA) | ||||
↓ | Move to Stage | Developer name | Aprove to Stage | |
Developer | ||||
↓ | Test Stage | QA | Merge to Stage | |
5. Testing on Stage | Quality Assurance (QA) | |||
↑ | Rework | Developer name | ||
→ | In testing | Tester name (if on testing) | ||
→ | Testing queue | QA (if in line) | ||
↓ | Ready to Install | QA | ||
Go to Release-Ticket process | ||||
6. Release | Quality Assurance (QA) | |||
↓ | Test Live | QA | ||
7. Testing on Live | Quality Assurance (QA) | |||
↑ | Rework | PM | ||
→ | In testing | Tester name (if on testing) | ||
→ | Testing queue | QA (if in line) | ||
→ | Test Live (if needed) | Author | ||
Author (if needed) | ||||
↑ | Rework | QA | ||
↓ | Completed | QA | ||
Quality Assurance (QA) | ||||
↓ | Completed on Live | QA (preparing to Close) | Transfer to Issue is completed status if there are no bugs and errors | |
X | Closed | |||
Project Manager (PM) | ||||
↑ | Rework | Developer name (if Hotfix) | Analysing Feedback and sending to Developer for Hotfix. Adding Rollback Request to Release-Ticket. | |
if needed rollback go to Release Ticket
(to step 3) |
||||
X | Closed | create a new ticket (if needed) |
New-Release-Ticket
New-Release-Ticket | ||||
---|---|---|---|---|
Steps | Role & Status | Assignee | Description | |
1. Creating (QA creates the ticket) | Quality Assurance (QA) | |||
→ | In Progress | QA | The tester completes a Release-Ticket and adds to this ticket other tickets that have been tested on the Stage | |
↓ | Ready to Install | System Administration | The Release-Ticket is ready to be uploaded to Life | |
2. Release | System Administrator | |||
→ | Planning and Install | System Administration | Planning time for Release is every Thursday 1pm EST | |
↓ | Test Live | QA | Merge to Live | |
Quality Assurance (QA) | Responsible tester for Release moves all tickets from Release-Ticket to Test Live status | |||
↑ | Rework | PM | If a Release-Tcket needs to be Rolledback | |
→ | In testing | QA | Choose Responsible person who’ll test and close Release-Ticket | |
X | Closed | |||
Project Manager (PM) | ||||
↑ | Rollback | System Administration | In case we need a Rollback, write a request and send a message to IT Helpdesk (if needed) | |
System Administrator | ||||
↓ | Rollback completed | QA | ||
Quality Assurance (QA) | ||||
→ | In Progress | QA | The tester again completes a Release-Ticket and adds to this ticket other tickets that have been tested on the Stage |
If errors are found at any of the steps, change the status and Assignee as Workflow recommend
If the task requires additional materials such as design or other, the Project Manager (PM) creates a Subtask
Execution of tasks without a ticket is not allowed.
In case of critical errors, it is allowed to formulate the problem in a different way.
When creating duplicate tickets, these tickets will be closed.
When changing Assignee, comments are written about what was done: NECESSARILY