IT Department: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
Line 14: | Line 14: | ||
= IT-Ticket System (Redmine) = | |||
== General Provisions == | == General Provisions == |
Revision as of 18:31, 26 May 2023
Units
IT-Systems
IT-Ticket System (Redmine)
General Provisions
We strive to make the workflow clear for every team member. We present a logical structure of interactions for review. This set of instructions is effective upon publication and is mandatory.
You can see the general scheme of the process at this link: https://orca.necs.ca/storage/files/3891595/Development%20Workflow%20v1.0.1_compressed.pdf
Instructions
Instructions to the Quality Assurance