IT Department: Difference between revisions

From Bloomex Wiki
Jump to navigation Jump to search
Line 7: Line 7:
[[Development]]
[[Development]]


=== IT-Systems ===
= IT-Systems =


[[Infrastructure diagram]]
[[Infrastructure diagram]]


[[Links to IT-Systems]]
[[Links to IT-Systems]]


= IT-Ticket System (Redmine) =
= IT-Ticket System (Redmine) =

Revision as of 18:32, 26 May 2023

Units

System Administration

QA and Testing

Development

IT-Systems

Infrastructure diagram

Links to IT-Systems

IT-Ticket System (Redmine)

General Provisions

We strive to make the workflow clear for every team member. We present a logical structure of interactions for review. This set of instructions is effective upon publication and is mandatory.

You can see the general scheme of the process at this link: https://orca.necs.ca/storage/files/3891595/Development%20Workflow%20v1.0.1_compressed.pdf

Instructions

Instructions to the Author

Instructions to the Developer

Instructions to the Quality Assurance

Instructions to the Project Manager

Instructions to the System Administrator